Swiss Federal Railway Line
At Bassecourt railway station, extensive work was carried out in order to construct a second track, whose purpose was to increase the frequency of trains between Delémont and Porrentruy. During the construction of this second track, the 66 kV high-voltage line between pylons 79 and 84 was relocated to the north.